Road Works at Maple Lodge Close. (December 2, 2009, 12:10:51 PM)
As from the 3.12.09 resurfacing work will commence at Maple Lodge Close and will continue for 3 days. Armitage Asphalt will be conducting the work with temp traffic control measure put in place during this time. Vehicle access to the reserve will continue although there may be some minor delays. Please drive slowly throughout this period and be prepared to be guided by any of the works operatives if necessary. Hopefully this should not be too much of a problem for any of you visiting the reserve throughout the works period.